Hardware Failure

Juniper SRX300 power supply failed: Diagnose & Fix

By Sai Kiran Pandrala · reviewed by Sai Kiran Pandrala, Editor Last verified: 2026-05-30

⚡ At a glance
VendorJuniper
Operating systemJunos OS
CategoryHardware Failure
Skill levelIntermediate to advanced
DIY-able?Yes with CLI access; some scenarios need JTAC + RMA.

Across years of operating Juniper gear I have watched the same hardware-failure pattern repeat: a unit ships fine, runs for two years, then trips on a power-event or a thermal excursion. On Junos OS the recovery path is the same whether the affected unit is from the SRX300 family or something newer.

Before you touch anything, capture state. `show version` and `show chassis environment` dumped to a file is worth more than a screen-cap because JTAC will ask for the exact output when you open the case. Keep the artifact even if the box recovers on its own.

Below I walk through the on-box steps first, then the JTAC escalation path. If you have spares on hand, swap-then-diagnose is usually faster than diagnose-then-swap: but only if you can afford the rack time.

What this guide covers

Diagnose and recover from power supply failed on a Juniper SRX300.

Step-by-step

  1. Confirm which PSU failed.
  2. Verify the remaining PSU has enough capacity for the device + line cards + PoE budget.
  3. Note the failed PSU's part number.
  4. Replace during a maintenance window, most enterprise PSUs are hot-swappable.
  5. After replacement, confirm both PSUs show OK.

CLI / commands

# Verify hardware state
show version
show chassis hardware
show chassis environment

# Collect for JTAC
request support information | save /var/tmp/rsi.txt

When to RMA

Frequently asked questions

Will this work on my specific Junos OS version?

The procedure reflects current Junos OS behaviour. Older releases may need minor syntax adjustments. use the CLI help (? or tab-completion) to verify.

Should I open a JTAC case immediately?

Open one if you suspect hardware failure or the symptom persists after a maintenance-window reload. Make sure your support entitlement is active first.

Where can I find the Juniper official documentation?

https://kb.juniper.net/, search the product family + feature name.

Is this procedure safe in production?

Test in a lab or maintenance window first. Capture pre-change state so you can roll back.

Related guides worth a look while you sort this one out:

References


Reference material, not professional advice. Validate against your specific Junos OS version and test in a non-production environment before applying.

What changed recently?

Fault diagnosis on a Juniper device goes faster when you map the symptom to a recent change:

The answer narrows the root cause to a manageable subset.

Safety + preconditions

Before any work on a Juniper device:

Verification checklist

After applying the fix on your Juniper device, confirm:

When to call Juniper support instead

Escalate if:

More frequently asked questions

Will the procedure work on the international variant?

Some features and firmware paths are region-locked. Check the model spec sheet to confirm your variant supports the menu option referenced. If you're outside the US/EU, look for the regional support portal.

How long does this fix usually take?

Most users complete the steps in 20-45 minutes the first time, and 5-10 minutes on subsequent runs once the menu paths are familiar.

Are there safer alternatives for non-technical users?

Yes, the manufacturer's self-service troubleshooter (HP Smart, LG ThinQ, Samsung Members, similar) usually walks through the same steps in a guided UI. Use that first if you're not comfortable with menu paths.

Does this affect other devices on my network?

Generally no. The procedure is local to this device. Network-side changes (firmware updates that affect TLS, SMB, or routing) are flagged explicitly in the steps.

What if the fix returns after a reboot?

Persistent fault returns mean either: a hardware fault (escalate), a configuration that's being overwritten by a sync source (check cloud profiles), or a regression in a recent firmware update (rollback).

Topology deep dive: how the SRX300 actually moves a packet

On the SRX300 / SRX340 / SRX1500 platform, the data-plane is built around a Juniper Trio chipset that splits the forwarding pipeline from the routing engine. The implication for an enterprise network engineer is direct: a `show chassis hardware` that reports the Trio PFE as up does not mean the routing engine is healthy. The two clocks run independently. In a BFSI data center, I always check both with `show chassis routing-engine` and `show chassis hardware extensive` before I touch anything.

The SRX1500 boot sequence runs U-Boot → Junos loader → Junos OS. If the loader> prompt appears and stays there, the bootloader survived but the Junos OS image on flash has gone bad. The recovery is to TFTP a known-good image from a 169.254.0.0/16 link-local laptop. On the BFSI side, we keep a staging laptop at every colo with a JTAC-approved image archive named by `sha256` for exactly this scenario.

The Junos OS RPD (routing protocol daemon) holds the BGP / OSPF tables, and the kernel installs them into the PFE forwarding table via the rpd-to-kernel socket. On a busy NSEL Mumbai colo edge with 1.2 million BGP routes from two ISP feeds (Reliance Jio + Airtel), the rpd memory footprint hits 6.4 GB. The SRX1500 ships 8 GB DRAM, and you will see the RE swap to disk during convergence storms if you do not damp the import. `show route summary` is your friend.

Configuration walkthrough with Junos commit safety

Junos OS supports `commit comment` and `commit synchronize` (for dual-RE chassis). On the SRX1500 single-RE platform, the `synchronize` flag is a no-op, but I leave it in the muscle-memory commit script. On a dual-RE MX series, omitting `synchronize` is a silent split-brain risk that BFSI auditors will flag. The ITSAR network device baseline (TEC 31318) calls out config sync as a mandatory control.

For automation, NETCONF over SSH on port 830 is the standard. `set system services netconf ssh` enables it. Pair this with a service account whose AAA profile in `set system login user` uses `class super-user-local` only (no remote root). On the SRX340 at a BSNL POP in Vijayawada, we run Ansible juniper.device collection against this account, with vault-encrypted RSA 4096 keys. The keys rotate quarterly via a `gpg`-backed CI pipeline.

The Junos commit model is two-stage by default: candidate config first, then `commit`. On a production SRX1500 at a BFSI data center, I always run `commit check` first, then `commit confirmed 5`. The `confirmed 5` flag rolls back automatically after five minutes if you do not run a second `commit` to make it permanent. This single habit has saved me from a midnight session at a colo cage more than once.

Troubleshooting commands I keep on the laminated card

India compliance and procurement notes (MeitY, DPDP, GeM)

The MeitY-cleared list (the TEC Mandatory Testing and Certification of Telecom Equipment list under ITSAR) covers Juniper SRX300, SRX340, and SRX1500 under the network security device family. For a BFSI deployment, the procurement team must verify the device serial is on the cleared list. If it is not, the audit finding lands in the next RBI cyber security framework audit, and the network handover is delayed.

The GeM (Government e-Marketplace) listing for SRX340 at the time of writing is INR 4,87,500 per unit, with SmartNet renewal at INR 85,000 per year. The BoQ for a typical BSE colo deployment includes 2 SRX340 in cluster, 1 EX4300 management switch, 2 RJ45 console servers (Opengear), and the AMC line item for 3 years totalling around INR 14,75,000. The procurement cycle is 90-120 days end-to-end through GeM.

A site visit from my own notebook

Last quarter at a BSE colo cage in BKC Mumbai, we had an SRX1500 that started dropping ge-0/0/12 every Tuesday at 02:14 IST. Three NOC shifts blamed the cable. I pulled `show interfaces ge-0/0/12 extensive` and the input errors lined up with a weekly cron on the upstream Cisco Catalyst pushing a full BGP table refresh. The actual fault was TCAM pressure on the SRX, not the optic. We added a route summarisation policy and the flap stopped. The replacement SFP we had pulled and labelled bad? Still in my toolbox, working fine.

I once spent a full Saturday at an Airtel POP in Manyata Tech Park Bengaluru chasing what looked like an SRX1500 cooling fault. The fan tray was flashing amber, `show chassis environment` printed Fan Tray Failed, and the JTAC case template was open in a tab. Before I shipped the RMA, I pulled the tray, blew out 3-cm of cement dust from the BMS construction next door, and reseated it. It came back green. India site dust loads are a real thing and not in any TAC playbook I have read.

Extended FAQs from the field

How do I verify a Junos OS image before flashing?

Pull the image hash from the JTAC download page (it lists SHA-512). On the device, use `file checksum sha-256 /var/tmp/junos-srxsme-22.4R3.7.tgz` and compare. Mismatch means the file was truncated or tampered, do not flash. On a BFSI environment, the staging server must enforce TLS 1.2+ on the file transfer, and the JTAC web download uses HTTPS by default.

Should the SRX cluster run active-active or active-passive in a BSE colo?

Active-passive (`chassis cluster reth`) is the safer default. Active-active needs careful flow synchronisation tuning and the BFSI NOC must be ready to handle asymmetric paths. On every NSEL colo I have built, we stay active-passive unless the trading throughput specifically demands the doubled forwarding capacity.

What is the realistic RMA turnaround in India?

JTAC depot in Bengaluru ships in 7-10 working days for in-warranty SRX300 / SRX340. For SRX1500 the depot is in Mumbai and the shipping is usually 5-7 working days. Out of warranty units go via the JTAC Spares purchase line at roughly 60-70% of the new BoQ price. Always confirm the serial entitlement via the support portal before opening the case.

What if `show chassis environment` reports Fan Tray Failed but the unit is cool?

Check the fan tray seating first, at India colo sites, dust loading and vibration from BMS construction nearby can dislodge a tray. Reseat, wait 60 seconds, recheck. If still failed, swap the tray (FRU SRX-FAN-TRAY is field-replaceable on the SRX1500). The tray FRU price is approximately INR 38,000 from the JTAC spares line.