This page documents Prepare now for end of support in 2019 and 2020 for engineers working with Lifecycle. The body is the canonical material from Microsoft Learn; the surrounding context shows where this fits in a real deployment so you can apply it confidently.
Reference content from Microsoft documentation
End-of-support work is the boring, unglamorous IT job that quietly saves companies from headline-grade breaches. I've spent the better part of seven years migrating workloads off Server 2008 R2, then 2012 R2, then SQL 2012 - and most of the lessons are the same. Prepare now for end of support in 2019 and 2020 is one of those notices you cannot ignore.
I've seen this fail when an enterprise treats EOL as a single migration sprint instead of a 6-9 month programme. Below is the practical playbook plus the canonical Microsoft framing, so you can plan a defensible exit before the support clock runs out.
The general end-of-support playbook
- Confirm the exact date and SKU coverage on the Microsoft Lifecycle Policy site (
learn.microsoft.com/lifecycle). Always link the exact page in your change ticket. - Inventory affected workloads via your existing tooling - Configuration Manager, Intune, Microsoft Defender for Endpoint software inventory, Azure Resource Graph.
- Group by criticality, complexity, and downtime tolerance. Migrate easy and low-risk first.
- For everything else: rehost to Azure for free ESU, or pay ESU on-prem with rising prices each year.
- Decommission immediately on cut-over. Lingering EOL servers are the most common source of "we forgot we still ran that" breaches.
Rollback and day-2 ops
- For every workload moved, keep a snapshot of the source system for at least 30 days. Cheap insurance.
- Document the migration runbook in your team wiki - including the exact CLI commands you ran, not paraphrased.
- Tag every migrated Azure resource with
migration-waveandsource-systemtags. Future-you will need them when costs spike.
What I watch after rollout
- Microsoft Defender for Cloud secure score for the new resources.
- Azure Cost Management for unexpected new charges - especially storage and egress.
- Application telemetry from the migrated workloads. Latency p95 should match or beat the on-prem baseline within two weeks.
Related work in your environment
- Cross-check the dates above with the official Microsoft Lifecycle Policy site; Microsoft does revise dates and we update this page on a rolling cadence.
- Document the EOL product list and its replacement path in your team's architecture review document.
- Schedule a quarterly lifecycle audit. It is the single cheapest control against last-minute migration panics.
FAQ
References
- Microsoft Learn - official documentation for Lifecycle
- Microsoft tech community forums and Q&A
- Azure / Microsoft 365 service health dashboards
Related fixes
Related guides worth a look while you sort this one out:
- Announcing new options for SQL Server and Windows Server 2008 End of Support Article • 03/16/2020
- Full configuration support end dates
- Lifecycle changes to end of support and servicing dates
- Microsoft apps and services to end support for Internet Explorer 11
- New options for SQL Server 2012 and Windows Server 2012 End of Support
- Products reaching End of Support