Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix
By Sai Kiran Pandrala · reviewed by Sai Kiran Pandrala, Editor Last verified: 2026-05-30
| Vendor | Arista |
|---|---|
| Operating system | Arista EOS |
| Category | Hardware Failure |
| Skill level | Intermediate to advanced |
| DIY-able? | Yes with CLI access; some scenarios need Arista TAC + RMA. |
Treat this like a flight checklist. `show version` and `show environment all` on Arista EOS returns the data you need for a Arista Arista TAC case. if you have that saved before the box dies completely, your support call is 20 minutes shorter.
I have seen C-200 (acquired Mojo) units that looked dead at the LED panel but were actually fine, the front panel had failed, not the data plane. Always verify with CLI before declaring time of death.
What follows is the recovery playbook, not the marketing version. Some steps assume a spare unit or a console cable; if you do not have them, the diagnostic section is still useful for the Arista TAC case.
What this guide covers
Diagnose and recover from all ports dead on a Arista C-200 (acquired Mojo).
Repair sequence
- Try the same cable + endpoint on a known-good port to confirm the issue is the device.
- If modular, re-seat the affected line card.
- Check the platform / hardware status command.
- If a single line card is dead, RMA it. If the supervisor or chassis, RMA accordingly.
CLI / commands
# Verify hardware state
show version
show inventory
show environment all
# Collect for Arista TAC
show tech-support | redirect file:show-tech.log
When to RMA
- Repeated failure after re-seat and power-cycle
- Visible burn, scorching, or physical damage
- POST or memory diagnostic failure
- Hardware crashinfo without a software workaround
Frequently asked questions
Will this work on my specific Arista EOS version?
The procedure reflects current Arista EOS behaviour. Older releases may need minor syntax adjustments, use the CLI help (? or tab-completion) to verify.
Should I open a Arista TAC case immediately?
Open one if you suspect hardware failure or the symptom persists after a maintenance-window reload. Make sure your support entitlement is active first.
Where can I find the Arista official documentation?
https://www.arista.com/en/support/toi. search the product family + feature name.
Is this procedure safe in production?
Test in a lab or maintenance window first. Capture pre-change state so you can roll back.
Related guides
References
- Arista support portal: https://www.arista.com/en/support
- Arista knowledge base: https://www.arista.com/en/support/toi
- Arista security advisories: https://www.arista.com/en/support/advisories-notices
- Open a case: https://www.arista.com/en/support/customer-support
Reference material, not professional advice. Validate against your specific Arista EOS version and test in a non-production environment before applying.
Why this matters for your day-to-day
A Arista device that's misbehaving costs more than the fix itself: lost productivity, missed calls, security risk, even safety risk in some categories. Treating the symptom quickly with a documented procedure is cheaper than letting it persist. The steps above are written to get you back to working in under an hour where possible, and to flag clearly when escalation is the right call.
Safety + preconditions
Before any work on a Arista device:
- Unplug from mains for any internal-access procedure.
- Discharge stored energy (capacitors in PSUs, residual battery charge) per manufacturer guidance.
- Use ESD-safe handling for boards and modules, no carpet, no wool sleeves.
- Avoid moisture; never apply liquids near vents or connectors.
- If you smell smoke, see scorch marks, or feel uneven heat, stop and escalate.
Post-repair audit
Before you walk away from a Arista device fix, run through:
1. Reproduce the original trigger: does the issue reappear? 2. Check the device's status / health screen for any new alerts. 3. Confirm paired devices (app, hub, controller) reconnected. 4. Save / commit any configuration changes per the device's normal workflow. 5. Note the change in your maintenance log with date + firmware version.
When to call Arista support instead
Escalate if:
- The same symptom returns within 24 hours of a clean fix.
- You see physical damage (burn marks, swollen battery, cracked PCB).
- The device is in warranty and a hardware replacement is the cheaper outcome.
- Repair requires specialised tools you don't own (alignment jigs, calibration software).
- Following the official path keeps the warranty intact, which matters more than the time spent.
More frequently asked questions
Are there safer alternatives for non-technical users?
Yes, the manufacturer's self-service troubleshooter (HP Smart, LG ThinQ, Samsung Members, similar) usually walks through the same steps in a guided UI. Use that first if you're not comfortable with menu paths.
What if my model isn't exactly the same revision?
Cross-check the model code on the rating plate against the manufacturer support page. Major firmware generations sometimes shift the menu path; the option is usually under a similarly-named section.
Is it safe to apply during business hours?
If the device is in production use, apply during a scheduled maintenance window. Most procedures need 2-15 minutes of downtime. Capture pre-change state so you can roll back if needed.
Can I roll this back if something breaks?
Yes for software-level changes (firmware rollback, config rollback). Hardware changes are usually one-way. Always back up settings before starting.
Should I update firmware first or last?
Update firmware first if a release note specifically mentions your symptom. Otherwise, finish the troubleshooting flow first, then update; that way you can isolate whether the update or the underlying fix solved it.
Field notes from real incidents on Arista
When I work on Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix the rhythm I lean on is the one I have built over years of these tickets. Arista EOS lets you reload a module without reloading the chassis on most platforms. I use that capability more than people realise. Show tech-support detail is the artifact Arista TAC expects on call one; bundle it with the agent logs before you open the ticket. EOS-API (eAPI) over HTTPS is the cleanest way to script Arista at scale; do not wrap CLI screen-scraping when eAPI returns JSON.
Tools I actually reach for
For Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix on Arista the cheapest signal I can land usually comes from a known order of operations, not a kitchen-sink approach. I start with show running-config | include <feature> because it is the lowest-friction way to confirm the failure is real and reproducible. If that returns ambiguous data, I escalate to show tech-support (capture for TAC), traceroute vrf <vrf> <target>, show logging last 200, packet capture on the ingress interface (TAC will ask for it), and finally to show platform hardware capacity only when the cheaper tools cannot reach the layer the failure lives in. That ordering matches the failure surfaces I have actually seen on Arista units over the last few years, not an abstract taxonomy. The cheap signals gate the expensive ones so the investigation does not balloon into a multi-hour exercise.
Verification I run before I close the ticket
Before I mark Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix resolved on a Arista unit, the verification loop below is what I actually run. Each step proves a different layer is green, and the order matters - the cheap checks gate the more expensive ones so I never burn an hour on a deep test that a shallow one would have failed in seconds.
show logging | include %LINK|%LINEPROTO|%BGP|%OSPFIf that one comes back clean, move to the next check. If it does not, stop and dig in there before layering more verification on top of a red signal.
show interfaces <int> | include errors|drops|CRCIf that one comes back clean, move to the next check. If it does not, stop and dig in there before layering more verification on top of a red signal.
show spanning-tree summary # confirm topology stabilityIf that one comes back clean, move to the next check. If it does not, stop and dig in there before layering more verification on top of a red signal.
show bgp summary # confirm session state after route changesIf that one comes back clean, move to the next check. If it does not, stop and dig in there before layering more verification on top of a red signal.
show ip route <prefix> # confirm best path post-changeOnly when every line above runs clean do I close the ticket and update the runbook with the timestamps. A green verification that nobody can reproduce is not a fix, it is luck waiting to regress.
Where I check first when the docs disagree
When two sources contradict each other on a Arista detail, the disambiguation order I lean on is stable across products and across years. arista.com/en/support/product-documentation for EOS command references is where I start for the ground-truth view. eos.arista.com for the official software documentation is where I start for the ground-truth view. github.com/aristanetworks for open-source tooling like Ansible roles is where I start for the ground-truth view. Arista TAC knowledge base is where I start for the ground-truth view. Random blog posts and reseller wikis are signal, not ground truth, and I treat them as such until the references above either confirm or contradict the claim. The cost of trusting an unauthoritative source on Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix is rarely worth the time it saved.
Pitfalls I have walked into on this exact path
The shortcuts that look smart on Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix have a habit of biting back. The pitfalls below are the ones I have personally walked into on a Arista unit, not things I read about. CloudVision Portal alerts are noisy unless you tune them; I disable the defaults and re-enable the ones that map to actual production events. Show tech-support detail is the artifact Arista TAC expects on call one; bundle it with the agent logs before you open the ticket. Arista EOS lets you reload a module without reloading the chassis on most platforms, I use that capability more than people realise. When in doubt I revert to the slower path that the manual prescribes - the time I save by skipping it is always smaller than the time I spend cleaning up afterwards.
What I tell the next on-call
When I hand Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix off to the next person on rotation, the three lines I leave in the runbook are these. First, the symptom signature on Arista - not a paraphrase, the exact string that surfaces in logs or on the screen. Second, the diagnostic that gave the highest signal in the least time. Third, the exact verification command whose green output justified closing the ticket. That trio is what turns a one-off fix into a runbook entry the next engineer can use without paging me at three in the morning.
I also add a one-line note on the cost of getting this wrong. For Arista C-200 (acquired Mojo) all ports dead: Diagnose & Fix on a Arista unit, the cost is rarely the replacement part or the patch itself. It is the downtime, the second site visit, and the trust deficit you spend with whoever owns the asset when the fix does not hold. That framing keeps the next on-call from choosing the cheap-looking shortcut that ends up costing the most in elapsed hours and goodwill.
Related fixes
Related guides worth a look while you sort this one out:
- Arista C-200 (acquired Mojo) single port dead: Diagnose & Fix
- Arista C-200 (acquired Mojo) won't boot at all: Diagnose & Fix
- Arista 7010T all ports dead: Diagnose & Fix
- Arista 7050X3 all ports dead: Diagnose & Fix
- Arista 7060X4 all ports dead: Diagnose & Fix
- Arista 7060X5 all ports dead: Diagnose & Fix
People also ask
Will this work on my specific Arista EOS version?
The procedure reflects current Arista EOS behaviour. Older releases may need minor syntax adjustments: use the CLI help (`?` or tab-completion) to verify.
Should I open a Arista TAC case immediately?
Open one if you suspect hardware failure or the symptom persists after a maintenance-window reload. Make sure your support entitlement is active first.
Where can I find the Arista official documentation?
https://www.arista.com/en/support/toi, search the product family + feature name.
Is this procedure safe in production?
Test in a lab or maintenance window first. Capture pre-change state so you can roll back.